Wednesday, 11 April 2012

Testing circuit with load (week 11)

Do the testing on the circuit with load. The load will connected to the current sensor ACS712.

When the load is switch OFF, there have no current :





When the load is switch ON, there have current through on the current sensor:












No comments: