Friday, 23 March 2012

Hardware Installation ( week 10)

Cut a board accordance with the size determined.

Place the DB base, socket point base and switch base on the board. 


Place the display on the DB cover.


This is a result after fitting socket point, bulb and switch point.

Do some testing to make sure the hardware running properly after the installation.

No comments: