Cut a board accordance with the size determined.
Place the DB base, socket point base and switch base on the board.
Place the display on the DB cover.
This is a result after fitting socket point, bulb and switch point.
Do some testing to make sure the hardware running properly after the installation.
No comments:
Post a Comment