Friday, 23 March 2012

Hardware Installation ( week 10)

Cut a board accordance with the size determined.

Place the DB base, socket point base and switch base on the board. 


Place the display on the DB cover.


This is a result after fitting socket point, bulb and switch point.

Do some testing to make sure the hardware running properly after the installation.

Monday, 12 March 2012

Etching & Soldering process ( Week 9)



 Before do the etching on the PCB circuit, the circuit  need to be fit on the board. 

The etching process. 


After finish the etching process.

After finish etching on the PCB, it need to be clean up first be move the next process.


The result after finish clean up on PCB.


After finish the etching process, the circuit need to drill to make a hole.

Then, the component fitted on the board and can start to solder with soldering iron.



The result after finish the soldering process.








Monday, 5 March 2012

PCB circuit (Week 8)


Create and do some testing circuit on Proteus software. Refer on picture below:



Circuit Diagram